- Dakon Construction Ltd. logo image



Doon Public School Renovations
March 2013
Kitchener, Ontario
Owner: Waterloo Region District School Board
Consultant: WalterFedy

This project was a renovation and two-storey addition to accommodate a new office, washroom, elevator, lobby, and supporting services at the school. The existing Principal’s office, washroom and entry vestibule was demolished to receive the new addition. The addition is separated from the existing school by a one hour fire rating and the new construction is sprinklered. The staff room on the second floor was divided to create a new barrier free washroom. Site work included patching and repairing the existing concrete sidewalks and asphalt paving.